wednesday, 2 September 2020
 
HOME | COMPANY | PROJECTS | CUSTOMERS | ENGINEERING | NEWS | CONTACTS
 
   
News 
Structure Ceiling in the Central Tunnel - Venda Nova III

Located inside the tunnel of the power reinforcement of Venda Nova III, the false ceiling and adjacent walkways have an implantation area of about 102x25.7 = 2621 m2.

The main supporting structure of the ceiling is formed by 20 metallic gates of 25.7 m of span spaced of 5 m except for the end gates that have a slightly lower spacing. The portico beams are IPE330, in circular arc, whose interior radius is 23.23 m.

The pillars are of HEA160 section, have 4.80 m of height and a slope of 4.70º with the vertical.



HOME | COMPANY | PROJECTS | CUSTOMERS | ENGINEERING | NEWS | CONTACTS