SE2P developed for Metaloviana the optimization of steel structures design.
|
| Developer: | Cāmara Municipal de Vila Franca de Xira | | | Year: | 2011 | Building Area:
| 4200 m2 |
Body 1 corresponds to the volume of the multipurpose pavilion itself, and it is an adaptation of the existing storage unit with 30x65m, which had its height increased by approximately 2.40 m for a total of 11m.
Body 2 corresponds to the social area and will be used as a reception area and bar / restaurant, being the only one that has a raised floor. Its roofing and side walls, have an advance of about 6m to the facade on the top, forming a flap with two eardrums of predominantly aesthetic effect.
Body 3 is developed in an L-shaped along two fronts of body 1, a lateral and a top one, with the predominant use of supporting the multipurpose pavilion, featuring locker rooms and other compartments of undifferentiated use. | |
|