The SE2P in collaboration with the GEG has designed 12 viaducts simply supported with spans varying between 38m and 59m.
|
The twelve viaducts are located between Km 10 + 478,456m and Km 11 + 067,941m, varying their gaps between 38 and 59 meters.
The structure of the trays is composed of a reinforced concrete slab, connected by connectors to stringers and steel crosspieces that guarantee their mixed operation.
The main challenge was the level of geometry given the slopes and curvatures of the track. | |
|